6ACompetitive edge
AI-Driven Production Optimisation
Uses contextualised surface-process data, soft sensors, forecasting and optimisation models to identify bottlenecks and production-at-risk conditions. Engineers receive explainable recommendations within approved operating constraints.

01 · What it delivers
What this delivers
8 scope
Automated Work Programme & Budget (WPB) Multi-Scenario Analysis & Planning
Automated daily and monthly production reporting, replacing manual spreadsheets
Deferment Tracking with Standardised Coding Integrated with Performance Trending
AI-Driven Monitoring of Production Parameters, Efficiency and GHG Monitoring
AI-Assisted Production Surveillance, Prediction & Optimisation
Automated Production Balance & Metering-Anomaly Analytics
Integrated Activity Planning (IAP) including gas supply-demand simulation
Business Continuity Plan Advisory for critical equipment downtime
02 · AI models
7 model families, 1 closed decision loop
The 7 Project 6A model families collectively enable ≥4% production uplift by finding hidden capacity, forecasting production losses, optimising well settings, maximising operating envelopes and identifying the optimum facility configuration. The value is measured as validated incremental production.
- PO-M01
Production & Environmental Performance / System Performance
Recover hidden capacity
Continuously identifies where the production system is operating below its effective capability.
- PO-M02
Short-Horizon Production Forecast
Protect planned production
Predicts near-term production and identifies expected deviation from plan early enough for Operations to intervene.
- PO-M03
Choke Prediction
Increase well deliverability safely
Final Recommendation to advise optimal choke opening to aligns sub-surface optimization with surface process capability and constraints, ensuring safe and optimal production.
- PO-M04
Deferment / PaR Forecast
Avoid production loss before it happens
Predicts production-at-risk and potential deferment before the loss occurs, ranks threats and indicates intervention timing.
- PO-M05
Sand Ingress Correlation
Unlock constrained wells while protecting integrity
Correlates sand behaviour with production conditions and erosion exposure, helping establish a safer operating envelope.
- PO-M06
SDV Performance Prediction
Protect facility availability
Uses SDV stroke-performance history and associated operating/maintenance information to identify deteriorating valves and prioritise intervention.
- PO-M07
What-if Scenarios
Find the highest-production feasibility
Simulates operating changes before implementation, initially including pumps and gas-lift compressors, and evaluates equipment/system constraints.
03 · AI agents
Production optimisation agents
- 01
Recover losses
Deferment Coding
Standardises loss causes so recurring deferment is targeted.
- 02
Optimise
System Performance / CPCP
Shows true capacity and bottlenecks to run nearer the limit.
- 03
Optimise
Gas-Lift Allocation
Directs limited lift gas to the wells that add the most output.
- 04
Optimise
Production Forecast
Flags plan variance early so corrections come sooner.
- 05
Recover losses
Deferment / Production-at-Risk Forecast
Ranks threats and latest safe action time to avoid losses.
- 06
Recover losses
Sand Ingress Correlation
Links sand events to deferment to protect rates safely.
- 07
Recover losses
SDV Performance Prediction
Predicts valve performance risk to avoid unplanned shutdowns.
- 08
Decide & act
Decision Orchestration / Recommendation
Combines agent outputs into ranked, constraint-aware actions.
- 09
Decide & act
Engineering Workbench / Case Management
Explainable cases to approve, track and close with feedback.
- 10
Data foundation
Data Contextualisation / Ingestion
Provides trusted, contextualised data for every agent.
- 11
Recover losses
GHG / FVI Root-Cause
Finds causes of flaring and venting to recover gas.
- Data foundation · 1 Trusted data for every agent
- Recover losses · 5 Cuts deferment, trips, flaring
- Optimise · 3 Runs capacity, gas lift nearer limit
- Decide & act · 2 Insight to approved, tracked action
04 · Values
≥4% production uplift and 50% faster planning cycle
MVP 1 directly builds the capabilities to detect degradation early, diagnose faster, quantify production impact, and recommend the latest safe action before failure.
At least 4%
KPI 1 · Production uplift*
AI-driven optimisation across surface and production-system constraints
Increase in overall production output.
4% against 3–5% industry benchmark range for AI-enabled production improvement.
- Detect hidden capacity
- Predict loss
- Optimise settings
- Validate uplift
50%
KPI 2 · Faster planning cycle
Improve production performance, planning, and operational decision-making
Target for Production Optimisation & Planning in the FOR3NSIQ project overview.
How KPI 2 is achieved
*Disclaimer The 4% production uplift is a target based on the 3–5% industry benchmark for AI-enabled production optimisation. Actual uplift can be higher and subject to operating constraints, facility/equipment performance, and successful implementation of identified optimisation opportunities.Benchmark source: BCG, AI at Scale in Upstream Oil & Gas Production Optimization (PDF, opens in a new tab) (PDF)
- Trusted insights
- Contextualise
- Diagnose
- Optimise
- Ranked recommendation
- Execution feedback
- Monitor execution & performance
05 · How it's achieved · KPI 1 · 4% production uplift
AI-driven optimisation across surface and production-system constraints
Collectively, the identified Production System Capacity Constraints represent approximately 5.49% of total oil deferment and 5.80% of total gas constraints, highlighting a tangible opportunity for production recovery through targeted debottlenecking and capacity optimisation.
2025 + 2026 YTD Malaysia Asset deferment Common denominator: total deferment by production stream
Produced water system limitationSeparators + liquid handling constraintMidstream constraint4% target
Oil field
4.00% Production Uplift Target (~70% Constraint Reduction via AI-Driven)
5.49% opportunity
Gas field
4.00% Production Uplift Target (~70% Constraint Reduction via AI-Driven)
5.80% opportunity
Capture logic4% against 3–5% industry benchmark range for AI-enabled production improvement.
Project 6 converts fragmented operating data into prioritised actions
M01 finds and diagnoses constraints; M02 forecasts risk and tests short-horizon recovery scenarios.
Multi-source data
- PI Data & sensors
- DOR / operations logs
- SAP notifications
- UDP Layer (LIMS / PGPS)
Production & Environmental Performance Model
- Detect hidden capacity
- Diagnose surface bottlenecks
- Quantify loss and emissions
- Rank controllable actions
Short-Horizon Production Forecast Model
- Predict near-term loss
- Forecast constraint persistence
- Test recovery scenarios
- Estimate incremental production
Action
- Set points
- Process envelope
- Potential unlock
- Priorities
CoverageProduced waterSeparators / scrubbersLiquid handlingExport / receivingPipeline / ullage
A closed decision loop turns insight into verified production
Human-in-the-loop recommendations with traceable baseline, action and post-action validation.
- 01
Detect
Hidden capacity
Anomaly + constraint surveillance
- 02
Predict
Loss trajectory
Short-horizon forecast
- 03
Optimise
Operating settings
Scenario ranking within safe envelopes
- 04
Validate
Incremental production
Measured vs counterfactual baseline
Operating guardrails: process safety limits • equipment envelopes • emissions constraints
Industry evidence supports the scale of ambition
External benchmarks show 1–2.2% production gains and meaningful avoided downtime from digital optimisation.
~2%
bp
Annual production increase
Technology integration across operated production. ≈20,000 boe/d; ~4% more production protected from offline.
2.2%
ExxonMobil
Production uplift
Closed-loop AI/ML gas-lift optimisation. 1,300+ Permian wells; no equipment changes.
1–2%
Shell
Additional LNG output
Real-time production optimisation. Data analytics improved control of LNG constraints.
Sources: bp (opens in a new tab); ExxonMobil benchmark reported by SPE Journal of Petroleum Technology (opens in a new tab); Shell LNG RTPO evidence (PDF) (opens in a new tab).
06 · How it's achieved · KPI 2 · 50% faster planning cycle
50% faster planning cycle
Improve production performance, planning, and operational decision-making.
- 01
Work Programme & Budget
Automated Work Programme & Budget (WPB) Multi-Scenario Analysis & Planning.
- 02
Integrated Activity Planning
Integrated Activity Planning (IAP) including gas supply-demand simulation.
- 03
Production reporting
Automated daily and monthly production reporting, replacing manual spreadsheets.
- 04
Production forecast
Flags plan variance early so corrections come sooner.
Predicts near-term production and identifies expected deviation from plan early enough for Operations to intervene.
07 · How it's achieved · In-house solutions
How Additional In-House Solution from Asset Solutions Embedded In Project 6
Protect uptime, avoid unnecessary trips and test changes before committing, supporting the ≥4% output target.
M06Physics + time-series degradation
SDV performance prediction
Tracks each SDV's closing time against its healthy baseline and forecasts when it will breach the allowable stroke limit, with the aim of running an offline simulated ESD test to predict the outcome.
Example · Bokor SDV
10 → 20 sclosing time after 15 months
~3 monthsuntil the 20 s limit may be exceeded
The model sees slow valve travel and predicts valve or actuator friction, so testing or inspection is scheduled early. Connection to PI tags / SAP will make functional and maintenance testing easier.
Planned repairs, higher uptime
PILOTPipeline Integrated Limitation & Operability Tool
PILOT network model
Network simulation of the export system shows how pressures and flows respond when fields trip or rates change.
Use case · Landing pressure study
Matched total flow and pressure from the Miri network, then simulated field trips. All cases stayed above trip settings: no cascading trips, setpoints retained.
Predict unnecessary cascading trips
M07Agent on equipment simulation outputs
What-if scenarios
Brings what-if results for a chosen piece of equipment to engineers, so scenarios can be compared before committing to a change.
Example · Bokor equipment
Gas lift compressorequipment-level scenario
COTPequipment-level scenario
An engineer can perform faster equipment simulation and compare it with actual data. The agent retrieves the result, compares it with the current baseline, and it is reviewed with the SME.
Safer, faster decisions
08 · Roadmap
MVP 1 and MVP 2
MVP 1
Jan 2027
Bokor production models; contextualisation, dashboards, alerts, optimisation recommendations and UAT.
MVP 2
Apr 2027
Deploy and validate production-optimisation models at KNNAG and the 3rd pilot asset.